吉尔吉斯共和国能源部及OJSC“Electric Stations”推介贾拉拉巴德州恰特卡尔(Chatkal)水电站项目,现征集投资人和战略合作伙伴,可考虑PPP及其他融资方式。电站计划装机251兆瓦,年均发电量约16.8亿千瓦时。
项目包括180米高的大坝和8.6亿立方米库容的水库,合作范围涵盖项目前期准备、设计、施工和投运。
一、项目概况
二、合作需求
寻求潜在投资人和战略合作伙伴,为项目融资并参与实施,包括项目准备、设计、施工和投运。可考虑PPP及其他融资安排,需经批准。详细项目文件、融资条件和实施安排有待确认。
三、报名材料
请有意向的企业提交以下材料:
附:外方原文
Company name: Ministry of Energy of the Kyrgyz Republic and OJSC «Electric Stations»
Country / region: Jalal-Abad Region, Kyrgyz Republic
Industry: Hydropower / Renewable Energy
Brief profile: The Chatkal HPP is a proposed hydropower project on the Chatkal River in the Chatkal District of Jalal-Abad Region, Kyrgyz Republic. The planned installed capacity is 251 MW, with average annual electricity generation of approximately 1.68 billion kWh. The estimated construction period is 5 years. The project includes a dam with a height of 180 metres and a reservoir with a capacity of 860 million m³. The planned construction area is approximately 1,600 hectares. The feasibility study (FS) is required.
Cooperation requirements: Seeking potential investors and strategic partners to finance and implement the project, including project preparation, design, construction, and commissioning. Public-private partnership (PPP) and other financing arrangements may be considered, subject to approval.
Valid until: -
Remarks: The project’s average annual river flow is estimated at 75.6 m³/s. The power station building is planned at an elevation of 980 metres. Detailed project documentation, financing terms, and implementation arrangements require confirmation.