吉尔吉斯斯坦上纳伦水电站梯级项目征集中国投资合作伙伴

2026-11-27T00:00+08:00 关键词: 求购 能源化工 吉尔吉斯斯坦 收藏

吉尔吉斯共和国能源部及OJSC“Electric Stations”推介上纳伦水电站梯级项目,现征集投资人和战略合作伙伴,可采用政府和社会资本合作(PPP)等方式。项目总装机237.7兆瓦,估算项目成本7.277亿美元。

与同类项目相比,该项目前期工作较为完整:可行性研究和部分项目文件已编制完成,所需土地已划拨,项目区域已有道路和电力基础设施。

一、项目概况

  • 位置:纳伦河上游,海拔约2100至2300米;
  • 电站构成:Akbulun HPP、Naryn HPP-1、Naryn HPP-2、Naryn HPP-3;
  • 多年平均年发电量9.424亿千瓦时;
  • 预计建设期5年;
  • 采用坝式引水方案,配小型水库以减少淹没面积;
  • 距最近的火车站巴雷克奇约183公里。

二、合作需求

寻求潜在投资人和战略合作伙伴,参与上纳伦水电站梯级的项目融资、建设和实施,包括通过PPP方式合作。

三、报名材料

请有意向的企业提交以下材料:

  1. 企业简介;
  2. 企业信息收集表。

附:外方原文

Company name: Ministry of Energy of the Kyrgyz Republic and OJSC «Electric Stations»

Country / region: Naryn Region, Kyrgyz Republic

Industry: Hydropower / Renewable Energy.

Brief profile: The Upper Naryn Cascade of Hydropower Plants is a proposed hydropower development project in the upper reaches of the Naryn River, at elevations of approximately 2,100–2,300 metres above sea level. The project comprises four hydropower plants: Akbulun HPP, Naryn HPP-1, Naryn HPP-2 and Naryn HPP-3.

- Total installed capacity: 237.7 MW

- Average long-term annual electricity generation: 942.4 million kWh

- Estimated construction period: 5 years

- Estimated project cost: USD 727.7 million

A feasibility study and part of the project documentation have been developed. The required land plots have been allocated, and existing road and electricity infrastructure is available in the project area.

Cooperation requirements: Seeking potential investors and strategic partners for project financing, construction and implementation of the Upper Naryn Cascade of Hydropower Plants, including through public-private partnership (PPP) arrangements.

Valid until: -

Remarks: The project envisages the construction of four hydropower plants using a dam-diversion scheme with small reservoirs to reduce the area of flooded land. The nearest railway station, Balykchy, is approximately 183 km from the construction area.