吉尔吉斯斯坦OJSC“Chakan HPP”(ОАО «Чакан ГЭС»)作为项目发起方,推介楚河州克明区Chon-Kemin河7.1兆瓦小水电站项目,现征集股权投资方。
一、项目概况
二、合作需求
外方投资建议为直接股权投资,期限10年,建设资金一次性投入,拟设立有限责任公司,以公司100%股份作担保。
投资金额待外方确认。
三、报名材料
请有意向的企业提交以下材料:
附:外方原文
Company name: OJSC “Chakan HPP” (ОАО «Чакан ГЭС») — project initiator
Country / region: Kyrgyz Republic
Industry: Renewable energy / Hydropower generation
Brief profile: OJSC “Chakan HPP” (ОАО «Чакан ГЭС») is the project initiator. 7.1 MW small hydropower project on the Chon-Kemin River, Kemin District, Chuy Region; diversion length 1.85 km; preliminary land allocation 14 ha. Initiator: OJSC Chakan HPP. Source: 43 (1).pdf (project profile and technical description).
Cooperation requirements: Investor proposal: USD 6,732,460 direct equity investment, 10-year term, single construction tranche; proposed LLC structure and security described as 100% company share.
Valid until: To be confirmed — no offer expiry date is specified in the source.
Remarks: The PDF lists total project cost USD 6,732,460; its enumerated cost items sum to USD 6,260,006, leaving USD 472,454 unexplained. Clarification is needed. Estimated payback 4.31 years is from the project profile, not a current assessment.
本网站不对所提供项目信息的真实性、准确性或可行性做出任何形式的保证,基于此信息而产生的任何法律后果与本网站无关。